Biggest US power grid proposes plan to regulators to cut wait times for data center power
NEW YORK: The biggest US electric grid operator, PJM Interconnection, said on Monday it is proposing a plan to federal energy regulators to speed up the connection of power plants and the energy-intensive data centers that need them, but the proposal may require data center companies to pay a larger share of grid costs.
The largest US power grid operator, PJM Interconnection, has proposed a plan to federal energy regulators to expedite the connection of power plants and data centers, a sector that demands significant energy. However, this proposal could potentially result in data center companies bearing a larger portion of grid costs. PJM, which serves 13 Mid-Atlantic and Midwest states, has been grappling with the surge in electricity demand due to Big Tech's rapid expansion of data centers over the past three years.
This demand-supply imbalance has led to a significant increase in power bills across a region covering 67 million Americans and an 6.8 gigawatt electricity supply shortfall that jeopardizes grid reliability if adequate power sources are not secured promptly. The proposal to the Federal Energy Regulatory Commission (FERC) aims to merge PJM's separate processes of examining power generation, transmission, and large loads like data centers, with the goal of reducing the study period from two years to 12 months.
According to PJM spokesman Jeff Shields, neither generation nor transmission infrastructure is expanding rapidly enough to keep up with the escalating demand, primarily driven by large loads such as data centers. By streamlining the planning process, PJM believes it can pinpoint precisely where and how the grid necessitates upgrades to accommodate new data centers.
This would provide states and utilities with clear information about the transmission costs incurred by data centers, enabling them to bill these companies directly rather than distributing costs among other users. Data center advocates have previously raised concerns about the combined study process, arguing that it might complicate the grid interconnection process and lead to prolonged delays in connecting power plants and data centers to the grid.
PJM is requesting the FERC to initiate a 60-day comment period on its proposed plan and render a ruling within 120 days.
Written by urgent.news from New Straits Times's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.