Urgent.News

What's breaking now, across thousands of outlets.

Tech

AWS says data centers in space won't be viable for 10 or 20 years

Amazon Web Services CEO Matt Garman claims that data centers in space are "highly unlikely to be economically viable or practical in the next decade or two." Garman said as much on Alex Heath's Sources podcast, published Nov. 10, where he addressed the feasibility of bringing AI infrastructure into orbit. Garman pointed to current launch limitations: "As a world we don't do even one launch a day…

Amazon Web Services CEO Matt Garman stated on a recent podcast that data centers orbiting the Earth are unlikely to become a reality within the next decade or two. During the interview, Garman highlighted the current limitations in space launches, noting that only one launch occurs daily on average. AWS is experiencing a surge in demand, adding a GPU to its systems every 14 seconds, yet still facing capacity shortages in the coming years.

The CEO emphasized the physical challenges of operating data centers in space, including the weight of GPU racks, the difficulty of dissipating heat without air, and the pervasive radiation that would necessitate additional protective measures. Among the proposed locations—space, oceans, and deserts—Garman believes deserts to be the most probable choice for establishing data centers.

Even with this option, AWS projects a shortfall in capacity for several years. For Mexico and Latin America, Garman concluded that terrestrial computing infrastructure will continue to be the primary constraint for at least a decade. He acknowledged that while these hurdles are technically surmountable, significant advancements in launch economics, frequency, and cooling systems would be required before orbital computing systems cease to be science fiction.

Written by urgent.news from Dev.to's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Read the original at dev.to →

More in Tech

Polling Video Status Before Download Into a Privately Controlled Bucket

Short answer: treat generation as a submitted job, not a completed video. Poll with exponential backoff and a hard deadline, obtain the download URL only after success, and copy the bytes into a…

  • Poll video status with exponential backoff and timeout
  • Store video bytes in privately controlled bucket after moderation
  • Keep moderation gate and never attach bearer token to download URL

Azure Outage Triage, Browser MCP, Code Security, and Agent Tools

These five projects sit at different layers of the development stack, but they share a practical theme: giving developers better context before they change code.

  • Microsoft 365 Status and Azure Service Health separate incidents
  • Open Orange runs Cloudflare Workers on Azure without code changes
  • AI-assisted security validation gate identifies code vulnerabilities

Why Your 10 W Attenuator Failed at 5 W

A 10 W attenuator running at 5 W continuous should be the least interesting part on the bench. It still comes back. When it does, the report usually says "overpowered", and the test log says 5 W, and…

  • 10 W attenuator fails at 5 W due to real-world conditions
  • Operating temperature and VSWR affect power rating
  • Proper mounting and frequency considerations crucial

More from Saturday 14 November →