Bengaluru-Madgaon Vande Bharat launch: How Indian Railways electrified the challenging Western Ghats route
Prime Minister Narendra Modi will inaugurate the Vande Bharat Express connecting Bengaluru and Madgaon today. This semi-high-speed train aims to enhance rail connectivity between Bengaluru's Karnataka coastal districts and Goa, catering to tourists, business travelers, pilgrims, and students. The 12-station journey includes stops at Shravanabelagola, Hassan, Sakleshpur, Subrahmanya Road, Kabaka Puttur, Mangaluru Junction, Udupi, Kundapura, Mookambika Road Byndoor, Murdeshwar, Gokarna Road, and Karwar.
Rail Minister Ashwini Vaishnaw emphasized that the electrification of the Western Ghats was crucial for introducing the Yesvantpur-Madgaon Vande Bharat Express. The electrification project, completed in December 2025, faced significant challenges, particularly in the Sakleshpur-Subramanya Road Ghat section. Spanning 55 kilometers, this stretch is characterized by a steep 1 in 50 gradient, 57 tunnels, 226 bridges, and 108 curves, posing technical difficulties.
The region is also prone to landslides during monsoon seasons, demanding extensive engineering efforts.
To ensure safety and reliability, the electrification project incorporated five switching stations, over 500 special brackets, and a robust overhead electrification system. Special attention was paid to tunnel electrification, with detailed geological studies and pull-out tests conducted to verify bracket anchoring strength. Construction faced disruptions due to heavy rainfall, landslides, and rockfalls, requiring materials to be transported by rail to remote areas.
Despite the challenges, the electrification project aims to reduce diesel dependence, improve efficiency, and promote sustainable railway operations.
Written by urgent.news from The Indian Express's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.