When the lights go out in Kampung Sungai Relang
Despite living just off the KL-Karak Highway, residents of this Orang Asli village depend on solar lamps, generators and energy projects that repeatedly fall into disrepair.
Kampung Sungai Relang, a Temuan village nestled just 500 meters from the KL-Karak Highway, struggles with a lack of reliable electricity. Out of 50 residents, about 116 Orang Asli villages across Malaysia remain without access to power, as reported in 2024. The village's solar-powered battery system provides limited electricity for basic needs, with some homes relying on solar lamps and others on diesel generators.
Yati Yusof, a 25-year-old resident, expressed gratitude for the meager supply as her family had previously relied on candles due to broken lamps. Without 24-hour power, there are no refrigerators or freezers in the village, leading to challenges like Otok Singgah's son having to drive 30 minutes for fresh meat. Abandoned solar installations stand as reminders of previous attempts to bring power to the village.
Efforts have been made over the years, including a hydro-solar microgrid installed in 2012 and solar panels installed in 2018, but both failed to provide consistent power. Experts emphasize the need for communities to be involved in maintenance and troubleshooting. SOLS Foundation is attempting to bridge the gap with small off-grid solar systems funded by Google, aiming for systems that last about five years with proper care.
Selangor’s Economic Planning Unit is considering funding another energy project for the village, pending an assessment. Reliable electricity is crucial not just for convenience but for safety and everyday necessities like seeing one's surroundings clearly.
Written by urgent.news from Free Malaysia Today's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.
- When the lights go out in Kampung Sungai Relang freemalaysiatoday.com