Urgent.News

What's breaking now, across thousands of outlets.

World

Auto, taxi fares in Keralam to go up from January 1; operators call off strike

Decision taken at meeting between representatives of auto-taxi trade unions and Transport Minister C. P. John; unions have demanded that existing minimum fare of ₹30 be raised to ₹50. Panel to study proposed revision

Auto, taxi fares in Keralam to go up from January 1; operators call off strike

The Government of Kerala has decided to revise auto-rickshaw and taxi fares in the state from January 1, 2027, following a meeting between trade union representatives and Transport Minister C. P. John in Thiruvananthapuram on Wednesday, November 11, 2026. This decision comes after the unions called off a 24-hour strike that was scheduled for Thursday, following their acceptance of the demand for a fare revision.

The unions had demanded an increase in the existing minimum fare of ₹30 to ₹50, and the government has agreed to consider the proposal. A commission will be constituted to study the proposed fare revision, with the final decision on the extent of the hike being made based on the commission's report. The new rates are expected to come into effect from January 1, 2027.

Brief written by urgent.news from The Hindu's own syndicated text. Machine-written — may contain errors; check the original before relying on it.

Read the original at thehindu.com →

More in World

Perlis boosts border vigilance as Thai bomb attacks raise security concerns

POLICE in Perlis have ordered tighter surveillance along the Malaysia-Thailand border following a series of bomb attacks in southern Thailand, including roadside explosions in neighbouring Satun that…

  • Perlis intensifies border surveillance due to Thai bomb attacks.
  • Three schoolchildren injured in Satun roadside explosions.
  • Cooperation with Thai authorities emphasized for early threat detection.

KHNP Faces Client Warning Over Dukovany Construction

The breakdown of construction contract negotiations between Korea Hydro & Nuclear Power (KHNP) and Daewoo Engineering & Construction over the 26 trillion won (about $20 billion) Czech Dukovany nuclear…

  • KHNP faces client warning over Dukovany construction contract negotiations.
  • Client Dukovany II Nuclear Power Plant holds KHNP responsible for contractor selection.
  • KHNP seeks new contractor, with final agreement by July 2027.

More from Wednesday 11 November →