Tema–Mpakadan railway gets €20m EU grant to fix signalling by December 2027
New signalling could let trains leave about every 10 minutes on a line that now runs one train movement at a time, the railway authority says.
The Ghana Railway Development Authority (GRDA) has received a €20 million European Union grant to improve the signalling system on the Tema–Mpakadan railway, with the project set for completion by December 2027. Currently, the line operates at only 20% of its potential capacity due to outdated signalling, resulting in just one train movement at a time.
The new European Train Control System (ETCS) Level 1 will allow multiple trains to run simultaneously, including those traveling in opposite directions, on the three crossing points along the route. GRDA expects the upgraded line to handle up to nine train movements per hour, with departures about every 10 minutes, if all goes according to plan.
The goal is to increase the line's utilization to at least four train slots, or 50% of its capacity, opening the door for more passenger and freight services.
Written by urgent.news from 3News's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.