Saudi Arabia sees major education sector transformation under Vision 2030
Education expert Mohammed Al-Amri says Saudi Arabia is undergoing a transformation in education, focusing on curriculum quality and development under Vision 2030.
Saudi Arabia inaugurated its first wind turbine for electricity generation in January 2017, located in Turaif, a region in the Northern Borders. The project, undertaken by Saudi Aramco, aimed to supply power to the company's petroleum products distribution facility. Saudi Aramco carefully selected Turaif among four potential locations due to its favorable wind resources, easy accessibility, and availability of connections to the electricity grid.
The turbine, with a capacity of 2.75 megawatts, was expected to meet the electricity needs of around 250 homes and save approximately 19,000 barrels of oil annually by decreasing dependence on conventional energy sources. Standing on an 85-meter tower with a rotor diameter of 120 meters, the blade tips reached up to 145 meters above ground.
The turbine was built with desert-specific protective features and connected directly to the electricity distribution network serving the facility. The wind-powered system was designed to cover the entire electricity demand of the facility, with any excess electricity being supplied to the primary power grid.
Written by urgent.news from Saudi Gazette's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.
- Where was Saudi Arabia’s first wind turbine installed? saudigazette.com.sa
- Houthi drone intercepted over Saudi Arabia's southern region, coalition says middleeasteye.net