Urgent.News

What's breaking now, across thousands of outlets.

World

General : Lynas Radioactive Waste Disposal Facility 77 Pct Complete As Of Aug 31

KUALA LUMPUR, Oct 26 (Bernama) -- The permanent disposal facility (PDF) for radioactive waste generated by Lynas Malaysia Sdn Bhd had achieved 77 per cent completion in construction and operations as of Aug 31, with 1.45 million metric tonnes of the 1.467 million metric tonnes of Water Leach Purification (WLP) waste generated having been transferred to the facility.

The Lynas waste disposal facility for radioactive waste generated by Lynas Malaysia Sdn Bhd reached 77% completion as of August 31, 2023, with 1.45 million metric tonnes of the total 1.467 million metric tonnes of Water Leach Purification (WLP) waste transferred to the facility. Science, Technology and Innovation Minister Datuk Chang Lih Kang reported that four disposal cells, designated A, B, C, and D, have been completed, while the process of filling the facility with Auto Leach Residue (ALR) waste continues.

The radiation dose readings outside the facility were below 20 millisieverts per year, complying with the stipulated limit under Act 304 (Atomic Energy Licensing Act 1984) for radiation workers, according to monitoring by the Atomic Energy Department (JTA) up to September 10.

Brief written by urgent.news from Malay Mail's own syndicated text. Machine-written — may contain errors; check the original before relying on it.

This story

This is one outlet's version. Read the fullest account.

Read the original at bernama.com →

More in World

More from Monday 26 October →