Four of 12 control posts under Golok River basin project handed over to GOF
PASIR MAS: The Kelantan Department of Irrigation and Drainage (DID) has handed over four of the 12 General Operations Force (GOF) control posts constructed under Phase One of the Sungai Golok Integrated River Basin Development Project (PLSB), which began in 2018.
We haven't written up this one. New Straits Times has the full story — the link below goes straight to it.