General : ECRL-LRT Gombak Pedestrian Bridge Expected To Be Completed By March 2027 - MRL
KUALA LUMPUR, Oct 23 (Bernama) -- The construction of a covered pedestrian bridge directly connecting the East Coast Rail Link (ECRL) Gombak station with the Gombak LRT station is expected to be fully completed by March 2027, according to Malaysia Rail Link Sdn Bhd (MRL).
We haven't written up this one. Bernama has the full story — the link below goes straight to it.
