Malaysia needs up to 2,000 MW additional RE capacity to achieve 2030 target
KUALA LUMPUR: Malaysia needs an additional 1,500 to 2,000 megawatts (MW) of installed renewable energy (RE) capacity to reach its 35 per cent installed RE capacity target by 2030, said the Sustainable Energy Development Authority (Seda).
We haven't written up this one. New Straits Times has the full story — the link below goes straight to it.