5.4 tonnes of 5.7 tonnes of ASM gold purchased in October refined locally – GoldBod CEO
The Ghana Gold Board (GoldBod) says it has refined 5.4 tonnes of artisanal and small-scale mining (ASM) gold locally so far in October 2026, representing 94.6% of the 5.7 tonnes purchased during the month.
We haven't written up this one. 3News has the full story — the link below goes straight to it.