MMRDA Completes Key Girder Work On Airoli–Katai Naka Road; 6-Km Stretch Nears Opening, Travel Time To Drop By 40 Minutes
The Mumbai Metropolitan Region Development Authority (MMRDA) has completed the erection of key steel girders on the up and down arms of the Airoli–Katai Naka elevated road at Bharat Bijlee Junction in Airoli, taking forward work on the 12.71-km access-controlled corridor. Heavy Girders Installed Overnight The operation involved installing curved girders weighing 95 tonnes and 110 tonnes on the…
The Mumbai Metropolitan Region Development Authority (MMRDA) has recently completed the installation of crucial steel girders on the Airoli–Katai Naka elevated road, marking a significant milestone in the ongoing construction of the 12.71-km access-controlled corridor. The 6-km stretch, which includes both completed and nearly finished phases, is set to open soon, with travel times on the Mulund–Katai Naka route expected to decrease by 40 minutes.
The project, part of MMRDA's "Mumbai in Minutes" initiative, is designed to provide motorists with a more direct route between Thane and Navi Mumbai, thereby reducing congestion on existing roads such as Thane–Belapur Road, Mahape Road, and Shilphata Junction.
Rewritten by urgent.news; may contain errors — check the original.
Source: freepressjournal.in