Urgent.News

What's breaking now, across hundreds of outlets.

Tech

Teo Nie Ching: RM300m smart city project to transform Kota Kinabalu by 2028

KOTA KINABALU, Oct 11 — Kota Kinabalu is set to be transformed into a smart city through a project worth about RM3...

Teo Nie Ching: RM300m smart city project to transform Kota Kinabalu by 2028

KOTA KINABALU, Oct 11 — The Kota Kinabalu Smart City Project, a RM300 million initiative, is set to revolutionize the urban landscape by February 2028. The endeavor is spearheaded by Deputy Communications Minister Teo Nie Ching, who highlighted the collaboration between the Malaysian Communications and Multimedia Commission (MCMC) and Kota Kinabalu City Hall (DBKK). The project aims to enhance urban management, public safety, and service delivery through a series of technological advancements.

The smart city project will see the development of extensive fibre-optic and public Wi-Fi networks, with 50 kilometres of backbone network and 308 kilometres of last-mile network set to be established. A significant aspect of the project includes the installation of 822 smart poles and multi-purpose poles throughout the city. Moreover, the project will introduce a Network Operations Command Centre (NOCC), which will house a data centre with a capacity of 120 kilowatts (kW), complemented by an additional 30 kW of reserve capacity. This will ensure continuous operations through a backup power supply system.

The NOCC, located in the refurbished Kota Kinabalu Magistrates’ Court, will be equipped with 1,696 closed-circuit television (CCTV) cameras. These cameras will facilitate real-time monitoring of urban activities, allowing DBKK to collect and analyze real-time data for more accurate and timely decision-making. This capability will significantly improve traffic management, security, and emergency response in the city.

Teo explained that the real-time data provided by the CCTV network will empower DBKK to make informed decisions, thereby enhancing urban management and service delivery. The NOCC renovation and data centre construction are expected to conclude within six months, following which DBKK staff will undergo training to operate the smart city system effectively.

In addition to technological advancements, the project also features public Wi-Fi facilities aimed at boosting digital connectivity, fostering local business growth, and creating new economic opportunities for the community. Teo emphasized that the MCMC will cover the operating costs of the smart city infrastructure for five years post-development, after which full ownership will be transferred to DBKK.

Kota Kinabalu MP Datuk Chan Foong Hin praised the project as a pivotal step towards modernizing Sabah’s state capital into a smart city. He highlighted that the integration of information from the CCTV network and other digital systems would enhance urban planning, traffic management, and public safety predictions. Chan expressed gratitude to MCMC for undertaking this transformative project, emphasizing its role in accelerating Sabah’s digital transformation.

Rewritten by urgent.news; may contain errors — check the original.

Sources: bernama.com · malaymail.com

Other reports of this story

Every outlet that reported this, and when →

Read the original at malaymail.com →

Report a problem with this story

More in Tech

Why Is My Code Slow? Big-O Explained With Real Timings

Almost every developer knows Big-O. Many can even say what O(n²) means. But very few have watched the real difference happen on their own machine.

  • Nested loops method takes O(n²) time complexity, causing exponential growth in execution time
  • Set method uses O(n) time complexity, providing linear growth in performance
  • Experiment demonstrates importance of choosing efficient algorithms and data structures

Nature Go

  • Nature Go app encourages screen-free outdoor exploration
  • AI verification layer ensures real outdoor discoveries
  • Open-source model adaptable for diverse communities

How I keep feedback pins on the right element when a website changes

When I built PinReview, a tool that lets clients click anywhere on a website and leave feedback, I thought the hard part would be screenshots. It wasn't.

  • Developed tool for clients to leave feedback on specific website elements.
  • Stored element's unique identifier, like ID or test attributes, to track pin.
  • Stored pin position as percentage of element's size for consistency across devices.

More from Sunday 11 October →