PJM approves fast-track interconnection for 2.1 GW from Engie, LS Power
The grid operator expects Engie’s two storage projects totaling nearly 1.7 GW and LS Power’s 455-MW gas-fired uprate will be online by mid-2029.
We haven't written up this one. Utility Dive has the full story — the link below goes straight to it.
Source: utilitydive.com