Urgent.News

What's breaking now, across hundreds of outlets.

Business

FG reviews $1.3bn Zungeru plant over low output

The Federal Government has begun a review of the $1.3bn Zungeru Hydropower Project as the 700MW plant is currently supplying only half its capacity to the Read More: https://punchng.com/fg-reviews-1-3bn-zungeru-plant-over-low-output/

FG reviews $1.3bn Zungeru plant over low output

The Federal Government has initiated a regulatory review of the $1.3 billion Zungeru Hydropower Project in Niger State, as the 700-megawatt plant currently generates only about half of its installed capacity for the national grid. The Infrastructure Concession Regulatory Commission (ICRC) has intensified its oversight of the project to pinpoint and address legal and operational issues hindering the plant's performance.

The review is part of efforts to boost power supply and tackle persistent electricity shortages across Nigeria. The project, a Public-Private Partnership (PPP) arrangement, is operated by Penstock Limited and currently produces approximately 350 megawatts to the grid. The ICRC's Director-General, Jobson Oseodion Ewalefoh, emphasized the government's commitment to addressing the power crisis, stating that President Bola Ahmed Tinubu's promise to solve Nigeria's power problem is genuine and requires collective efforts to achieve this goal.

Rewritten by urgent.news; may contain errors — check the original.

Source: punchng.com

This story

This is one outlet's version. Read the fullest account.

Every outlet that reported this, and when →

Read the original at punchng.com →

Report a problem with this story

More in Business

More from Friday 9 October →