Keralam cuts deals with NTPC to tide over power crisis, meet long-term needs
The Keralam government on Wednesday took several important measures to tide over the state’s power crisis, including the setup of a dedicated power plant in the state to meet long-term energy needs
The Kerala government has taken several steps to address the state's power crisis and fulfill long-term energy needs, as announced on Wednesday. State Chief Minister VD Satheesan and Minister of Power Sunny Joseph met with National Thermal Power Corporation (NTPC) officials in Delhi to discuss procurement of electricity and development of mechanisms for long-term requirements.
The Kerala State Electricity Board (KSEB) will sign a memorandum of understanding (MoU) with NTPC and NTPC Green Energy Limited (NGEL) to establish a 2000 MWh Battery Energy Storage System (BESS) at Kayamkulam in Alappuzha district. Furthermore, two new 200 MWh BESS projects at Pothencode and Sreekandapuram will be operational by March 2027.
The government also plans to expedite a 27MW solar project being developed by NTPC at Kayamkulam. To meet future energy demands, the State government has urged NTPC to build a specialized power plant within the state, while NTPC is expected to sign a power purchase agreement to acquire electricity from the Ramagundam power plant in Telangana.
The discussions primarily focused on ensuring professional and technical expertise from NTPC for KSEB to manage modern power systems. These decisions aim to tackle the state's energy requirements, following a power crisis where KSEB had to implement evening and nighttime power cuts to accommodate growing demand. The crisis was caused by a rainfall deficit, the El Nino effect, and a lack of power purchase agreements. Assistant Editor Vishnu Varma reported from Kerala for The Hindustan Times.
Rewritten by urgent.news; may contain errors — check the original.
Source: hindustantimes.com