Urgent.News

What's breaking now, across hundreds of outlets.

World

First Niger Bridge set to reopen soon – Federal controller

The Federal Controller of Works says the First Niger Bridge may reopen this week as major rehabilitation works have been completed on the vital transport l Read More: https://punchng.com/first-niger-bridge-set-to-reopen-soon-federal-controller/

First Niger Bridge set to reopen soon – Federal controller

The Federal Ministry of Works has announced that the First Niger Bridge, which connects Onitsha in Anambra State to Asaba in Delta State, may reopen before the end of the week. The bridge, which was closed from September 7 to 21 for emergency rehabilitation and maintenance works, is expected to reopen once all major construction works have been completed.

Federal Controller of Works, Timothy Emenike, stated that the tarring of the bridge, which was a major construction activity, has been finished. However, the painting of railings is still ongoing. Emenike assured that barring "unforeseen circumstances", the bridge would likely be reopened before the end of the week. The reopening is expected to provide relief to motorists and residents who faced disruptions during the rehabilitation period.

The bridge was built in 1965 and was closed due to vandalised structural components, including its expansion-joint steelwork.

Rewritten by urgent.news; may contain errors — check the original.

Source: punchng.com

This story

This is one outlet's version. Read the fullest account.

Every outlet that reported this, and when →

Read the original at punchng.com →

Report a problem with this story

More in World

Umalusi ready for the 2026 matric exam

More than a million candidates are expected to write the exams from October 13 until November 26

  • Umalusi declares readiness for 2026 matric exams
  • Over one million candidates expected to take exams
  • Computer Applications Technology and languages first assessed

More from Thursday 8 October →