Chile copper mines disruptions put 5% of production at risk
New study finds labour disputes, weather, safety and geology threaten output across Chile’s biggest copper mines.
Chile's copper mines face disruptions that could put 5% of production at risk, according to a new assessment by GEM Mining Consulting. The Production-at-Risk Index evaluated 14 major copper operations across eight potential threats, with scores ranging from 2.6% to 9%. El Teniente had the highest risk at 9%, followed by Los Pelambres at 8% and Escondida at 7.5%.
Nine out of the assessed operations carry at least one high-risk factor. This comes after a challenging period for Chile, which produced 9.3% less copper from January to July 2025 compared to the same period in 2024, with July output reaching its lowest monthly level since 2011. The index aims to quantify the impact of various disruptions, such as labor disputes, weather events, accidents, geological issues, and processing problems that can interrupt production.
Antofagasta's Centinela mine began an indefinite strike, BHP's Escondida shut down after a fatal accident, and storms affected Los Pelambres and Caserones. Codelco suspended its Andes Norte project at El Teniente due to deep seismic risks. The assessment reveals that the highest-risk operations often have multiple vulnerabilities, rather than a single threat.
For example, El Teniente faces high geotechnical and safety risks along with four other medium-rated categories, while Los Pelambres is vulnerable to high weather and water exposure. Escondida has high ratings for both labor and safety risks. The assessment shows that Chile's production risk is not evenly distributed across its major mines, with some mines facing greater threats than others.
Rewritten by urgent.news; may contain errors — check the original.
Source: mining.com