Urgent.News

What's breaking now, across thousands of outlets.

Tech

'This data center belongs downtown': Developer proposes 20-story vertical data center in Kansas City to trade suburban sprawl for urban density

Revitalization Unlimited proposes 20-story Kansas City data center using vertical construction to reduce land requirements despite higher costs.

'This data center belongs downtown': Developer proposes 20-story vertical data center in Kansas City to trade suburban sprawl for urban density

A developer in Kansas City has proposed building a 20-story vertical data center on just 0.23 acres of land. Only two floors of the tower would house servers, while the remaining 18 floors would accommodate power and cooling systems. The project would cost $183 million, or about $1,300 per square foot, which is higher than typical suburban construction costs.

Revitalization Unlimited, the developer, argues that this vertical data center is necessary because certain computing workloads benefit from being physically closer to users and networks. Financial trading, content delivery, and inference services are examples of workloads that could take advantage of the dense urban environment.

The facility would generate 24 MW of IT capacity, with natural gas contributing to the operating expenses.

Written by urgent.news from TechRadar's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Read the original at techradar.com →

More in Tech

Security Audit Report: Reentrancy & Access Control Review: Binance staked ETH

Security Audit Report: Reentrancy & Access Control Review: Binance staked ETH Target Protocol : Binance staked ETH (TVL: $9586.9M) Security Audit Report – Reentrancy & Access‑Control Review Protocol…

  • No reentrancy vulnerabilities found in ERC-20 functions
  • Cross-chain callback in RedemptionRouter contract poses medium severity reentrancy risk
  • Admin role controlled by single Ethereum address with high impact vulnerabilities

What’s your take on Upwork in fall 2026?

Developers, what’s your take on Upwork in fall 2026? Are you finding solid projects at reasonable rates? Is it worth joining as an experienced engineer with no track record on the platform?

More from Wednesday 7 October →