Q2 Metals Extends Near Surface Mineralization 100 Metres North at the Cisco Lithium Project, Intercepting 134.5 Metres at 1.20% Li₂O and 101.6 Metres at 1.02% Li₂O
Highlights: CS26-096: two (2) separate intervals, including: 134.5 m at 1.20 % Li2O (starting at surface), and 101.6 m at 1.02 % Li2O The entire 101.6 m interval in hole-96 is outside of the conceptual pit-shell defined in the April-2026 MRE. CS26-095: 10 separate intervals, including: 70 m at 1.28 % Li2O, 31.3 m at […]
We haven't written up this one. Financial Post has the full story — the link below goes straight to it.