Urgent.News

What's breaking now, across hundreds of outlets.

Business

NFR Accelerates Railway Infrastructure Development in Guwahati and Adjoining Areas

Northeast Frontier Railway (NFR) is undertaking a series of major infrastructure and capacity enhancement projects in Guwahati and its adjoining areas to meet the growing demand for rail services, improve operational efficiency and strengthen connectivity across the Northeast. As the gateway to the region and the headquarters of NFR, Guwahati Railway Station handles more than 50,000 passengers…

NFR Accelerates Railway Infrastructure Development in Guwahati and Adjoining Areas

The Northeast Frontier Railway (NFR) is investing heavily in expanding and upgrading railway infrastructure in and around Guwahati, the region's major hub and headquarters. This push aims to meet rising demand, boost efficiency, and improve connectivity across the Northeast.

A key development is the Kamakhya–Guwahati 3rd Line Project, a 5.74 km extension that will increase capacity, relieve congestion and streamline train operations. Completion is slated for 2028, benefiting passengers and residents of Kamrup Metro district. Simultaneously, the ambitious Agthori–Kamakhya Double Line Project, coupled with the 2nd Saraighat Rail-cum-Road Bridge, will add 7.20 km of rail and road infrastructure.

The bridge alone spans 1.3 km and will bolster both rail and road connectivity, facilitating more commuter train services and easing pressure on the existing Saraighat Bridge.

To further modernize rail facilities, construction of a Mega Coaching Complex at New Guwahati is underway. This Rs. 227 crore project will house three pit lines, four stabling lines and two automatic coach-washing plants, boosting coaching capacity and maintenance capabilities. Station redevelopment is also underway, with Guwahati Railway Station being transformed into a modern, IT-enabled facility on a green-building model.

The station will boast solar power generation, efficient waste and water management systems, and a second entry to reduce station-related traffic congestion. Meanwhile, an elevated viaduct is being built along the Deepor Beel stretch to ensure wildlife safety while maintaining railway connectivity. The final 13.25 km of the Azara–Kamakhya double-line stretch is expected to be completed by July 2028.

In the freight and logistics sector, NFR is strengthening the Guwahati region's cargo handling capabilities with the recently completed Gati Shakti Cargo Terminal at Baihata. Additionally, improved rail connectivity between Jogighopa station yard and the Multi Modal Logistics Park's (MMLP) GCT siding will bolster Jogighopa's potential as a major Northeast logistics hub, streamlining the multimodal movement of goods throughout the region.

Taken together, these major infrastructure projects are poised to drastically enhance the capacity, efficiency and resilience of the railway network surrounding Guwahati, delivering a more seamless and sustainable rail experience for passengers and freight alike.

Rewritten by urgent.news; may contain errors — check the original.

Read the original at freepressjournal.in →

More in Business

More from Wednesday 7 October →