Urgent.News

What's breaking now, across thousands of outlets.

Business

Jurong Island energy storage system not part of core power reserves: Tan See Leng

EMA is evaluating how Singapore’s power system can incorporate such energy storage in future planning

The 200-megawatt Sembcorp battery energy storage system on Jurong Island does not contribute to Singapore's required generation reserves, according to Minister Tan See Leng. This is due to the limited duration in which the system can discharge its maximum output of 200 MW - approximately an hour. The system's primary function is to provide rapid-response backup to maintain grid stability, not to offset prolonged power generation outages.

Written by urgent.news from The Business Times - Singapore's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Also reported by 1 other outlet

Read the original at businesstimes.com.sg →

More in Business

More from Wednesday 7 October →