Days after launch, bridge meant to ease traffic snarls ends up causing them
The Ahmedabad Municipal Corporation has issued a show-cause notice to the design consultant firm behind a Railway Overbridge (ROB) project in Makarba, alleging the structure has contributed to worsening traffic conditions within weeks of its inauguration. The firm, DELF Consulting Engineers (India) Pvt Ltd, which operates as an extension of its South African counterpart, was the architect behind the 4-lane bridge, inaugurated on September 24 under the Phatak-mukt Bharat Abhiyaan aimed at freeing roads from level crossings.
The bridge, intended to alleviate traffic snarls caused by Level Crossing 24 on the Ahmedabad-Botad broad-gauge route, ended up at a junction on Corporate Road in southwest Ahmedabad, leading to congestion on roads connecting the Sarkhej-Gandhinagar Highway. The AMC has tasked DELF Consulting Engineers (India) Pvt. Ltd. with conducting a technical study of the present traffic situation, analyzing root causes of congestion, and proposing immediate corrective and long-term solutions.
The issue stems from the bridge's proximity to the Corporate Road junction, which leaves insufficient space for merging, weaving, and dispersing traffic, according to the show-cause notice. Following the technical study and the design consultant's clarifications, the AMC plans to evaluate the findings and take necessary actions to ease traffic congestion.
Meanwhile, the corporation has implemented a capsule design layout to optimize traffic flow and has widened the road from Corporate Crossroads to SG Highway to its full width, anticipating improved traffic flow once completed.
Written by urgent.news from The Indian Express's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.