Berlin’s New Central Station Needs Expensive Renovation
The German capital's giant "Hauptbahnhof" was inaugurated only 20 years ago. Still, Deutsche Bahn says there is a lot to repair and replace.
Berlin’s central station, known as "Hauptbahnhof," underwent its inaugural ceremony on May 26th, 2006. The station replaced "Ostbahnhof," which was the largest station in the reunified German capital. Despite being the most popular station, "Hauptbahnhof" boasts a greater number of platforms. This central hub features 12 platforms for long-distance trains, four on the second floor and eight in the basement.
Additionally, there are four city train (S-Bahn) platforms and one U-Bahn (subway) platform. On an average day, 1,300 trains stop here, accommodating 330,000 passengers who either board or leave trains. According to Deutsche Bahn, experts are evaluating the technical equipment and identifying what needs to be altered or replaced.
This extensive undertaking is expected to commence in the early 2030s. Unfortunately, one problem was overlooked: on platforms 11 to 14 on the second floor, there are bottlenecks that become particularly congested during peak hours. To resolve this issue, Deutsche Bahn may need to remove skylight openings, which are meant to provide natural light to the lower floors.
Furthermore, Europaplatz, the northern station square, is experiencing chaos due to trams, taxis, and a significant traffic artery, Invalidenstrasse, all competing for space. The station is working on improving this area by adding greenery and finding solutions for taxis and bicycles. Additionally, there are urgent matters that need to be addressed, such as train tracks in the basement.
Next year, from February to April of 2027, Deutsche Bahn aims to begin renovations in these areas. This will impact passengers, particularly those traveling to BER Airport in Schönefeld, located in neighboring Brandenburg. The FEX Airport Express train will be temporarily suspended during the renovation process. Moreover, the RE20 regional train and S-Bahn train tracks will also be affected.
So far, Deutsche Bahn has not disclosed which long-distance train routes will be impacted and how they plan to address the disruptions caused by the renovation efforts. In the summer of the following year, the S-Bahn train tracks upstairs will also require refurbishment, which will affect several crucial city train lines. They must temporarily reroute around the central station during these upgrades.
Written by urgent.news from The Berlin Spectator's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.