South Africa: Cape Town's Unfinished Freeway in a Tunnel, but Costs Up in the Air
[Daily Maverick] Cape Town has unveiled plans to replace its unfinished Foreshore freeways with a new bridge and tunnel, while unlocking 15 hectares for housing, public space and a new neighbourhood. But the cost, funding model and engineering risks remain unclear.
Cape Town has announced plans to replace its unfinished Foreshore freeways with a new bridge and tunnel, while creating 15 hectares of land for housing, public spaces and a new neighborhood. However, the exact cost, funding model, and engineering risks remain uncertain. The unfinished bridges, including the Foreshore Freeway Bridge, have become a recognizable part of the city's skyline and have been featured in films and stunt scenes.
Construction of the bridge began in the early 1970s with the intention of connecting the central business district (CBD) to coastal areas, but the project was halted due to funding challenges. The new proposal, revealed by Mayor Geordin Hill-Lewis on 2nd October, aims to provide a long-awaited completion of what has become known as Cape Town's unfinished freeway.
The plan involves constructing a new bridge that would directly link the inbound freeway to Helen Suzman Boulevard, bypassing Buitengracht Street underneath. The outbound freeway would be placed within an underground tunnel alongside Duncan Road. The transformation of the surrounding 15 hectares of land into a new neighborhood is also part of the plan.
Mayor Hill-Lewis described this as the end of "50-year-old unfinished business," emphasizing the potential benefits of the project.
Written by urgent.news from AllAfrica's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.