Mokama’s new rail bridge commissioned, boosting north-south Bihar train connectivity
Indian Railways has officially commissioned a new rail bridge over the River Ganga in Mokama, Bihar, aimed at enhancing north-south connectivity within the state. The bridge, costing approximately Rs 2,400 crore, will further bolster rail connectivity between North and South Bihar, presenting an additional route for both passenger and freight trains.
The new bridge, parallel to the existing Rajendra Pul, features a double railway line and was inaugurated after receiving safety clearance from the Commissioner of Railway Safety (CRS) on October 3-4, 2026. Operations began on the bridge around midnight, with the Mahananda Express being the first train to cross it.
Constructed about 50 meters towards the Patna side of the existing Rajendra Pul, which has been operational since 1959, the new bridge spans approximately 15.5 km. This includes a 1.9-km main bridge over the Ganga, connecting Mokama and Barauni, comprising 17 steel spans. The project also incorporates around 3.6 km of rail viaducts, eight minor bridges, two road overbridges, and three rail-over-rail structures.
The CPRO noted that the new bridge's design minimizes alterations to the approaches of the existing bridge, ensuring continued train operations on the old bridge. The bridge adds a third railway line to the existing corridor, significantly increasing capacity and improving freight movement efficiency. This enhancement is anticipated to boost the movement of essential goods and commercial activity, potentially doubling railway traffic in the corridor and reducing transportation costs.
Written by urgent.news from The Indian Express - India's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.