German Rail: Long-distance trains' punctuality remains at low level
Renovations and system failures continue to slow down the railways. In September as well, almost every second long-distance train was delayed.
The German rail company Deutsche Bahn reported that nearly half of its long-distance trains were delayed in September, with a punctuality rate of 52.4%. This was the third-worst monthly performance of the year, attributed to a high number of system failures, including track conditions that forced ICE trains to slow down between Berlin and Wolfsburg.
The Hannover-Berlin route, which includes this corridor, is set to be closed for major repairs until mid-December 2027, with trains being rerouted via Braunschweig and Magdeburg, adding around 80 minutes to the journey between Berlin and Hannover. The company's target of 60% punctuality in long-distance travel this year is now unlikely to be met.
Written by urgent.news from Handelsblatt's report — not a translation of it. Machine-written — may contain errors; check the original before relying on it.