RM100mil spent on JB flood mitigation, but system overwhelmed by intense rain
JOHOR BARU: More than RM100 million has been spent by the city council on drainage and flood mitigation works since 2023, but existing infrastructure was still unable to fully cope with today’s intense rainfall coinciding with a high tide.
We haven't written up this one. New Straits Times has the full story — the link below goes straight to it.