Urgent.News

What's breaking now, across thousands of outlets.

Business

FG starts new power control centre to curb blackouts

The Federal Government has begun constructing a new National Control Centre in Osogbo to replace a 64-year-old facility and improve Nigeria’s grid reliabil Read More: https://punchng.com/fg-starts-new-power-control-centre-to-curb-blackouts/

FG starts new power control centre to curb blackouts

The Federal Government has initiated the construction of a new National Control Centre for the Nigerian Independent System Operator in Osogbo, Osun State, aimed at replacing the aging 64-year-old facility and enhancing the management of Nigeria's electricity grid. Vice-President Kashim Shettima inaugurated the project on Wednesday, alongside the Minister of Power, Joseph Tegbe.

The new center is part of the government's efforts to improve electricity reliability and address supply weaknesses, aligning with President Bola Tinubu's Renewed Hope Agenda. The facility will incorporate an integrated Supervisory Control and Data Acquisition system, advanced display screens, and analytical tools to enable operators to detect faults, plan preventive maintenance, and optimize generation and transmission capacity.

In addition to bolstering grid reliability, the new control center will improve responses to disturbances, support renewable energy integration, and strengthen coordination with the West African Power Pool. The project will also incorporate robust physical and cybersecurity measures to protect critical infrastructure. NISO's Managing Director, Abdu Bello Mohammed, emphasized that the control center would enhance NISO's grid monitoring, decision-making, and overall system operation.

Written by urgent.news from Punch Nigeria's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Also reported by 1 other outlet

Read the original at punchng.com →

More in Business

Temasek broadens Gulf presence with two new offices

Singapore’s Temasek plans to open offices in Riyadh and Abu Dhabi in the first half of 2027, establishing its first physical presence in the Middle East as it steps up investment and partnerships…

  • Temasek to open offices in Riyadh and Abu Dhabi in 2027
  • First physical presence in the Middle East for the firm
  • CEO Dilhan Pillay Sandrasegara highlights regional growth potential

More from Wednesday 30 September →