NMDC commissions ₹5,427 crore iron ore processing complex in Chhattisgarh; stock slides 2%
The commissioned project comprises three components: a new iron ore processing plant at Bacheli, a 135-kilometre, 15 MTPA slurry pipeline, and the 2 MTPA pellet plant at Nagarnar.
State-owned iron ore miner NMDC Limited commissioned a ₹5,427-crore integrated project in Chhattisgarh on Saturday, including a 2 million tonne per annum pellet plant at Nagarnar and a 135-kilometre pipeline. The project connects mining operations at Bacheli with NMDC's steel plant in Nagarnar, reducing road-based ore movement and reliance on railways.
The stock of NMDC fell 1.66 per cent to ₹78.24, with sellers outnumbering buyers. This project, spanning three components, is part of NMDC's strategy to increase its iron ore production capacity to 100 million tonnes.
Written by urgent.news from Hindu BusinessLine's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.