Urgent.News

What's breaking now, across thousands of outlets.

Business

Hyundai E&C Launches AI Data Center Project in South Korea

Hyundai Engineering & Construction has begun construction of a high-performance artificial intelligence data center in Pohang, South Korea, as demand for infrastructure capable of handling increasingly intensive AI workloads continues to grow.Hyundai E&C said on September 21 that it had finalized th

Hyundai Engineering & Construction has commenced the construction of a high-performance artificial intelligence (AI) data center in Pohang, South Korea, to meet the growing demand for infrastructure capable of handling intensive AI workloads. The Pohang AI Data Center project, commissioned by AI Factory Pohang PFV, has finalized its main construction contract and has begun installing precast concrete structures at the site.

The facility, located in the Gwangmyeong General Industrial Complex in Ocheon-eup, Nam-gu, Pohang, will have a power capacity of 40 megawatts and an IT load of 32 megawatts. Scheduled for completion in the second half of next year, the 16.5-month construction period reflects Hyundai E&C's use of precast concrete (PC) construction throughout the concrete structural system, which is expected to reduce structural construction time significantly compared to conventional cast-in-place methods.

The ultra-high-density environment, featuring GPU-based infrastructure designed to handle large-scale data processing and real-time AI computing, aims to be 10 times more power-dense than conventional cloud data centers. The project's introduction of a liquid-cooling system and Power Usage Effectiveness (PUE) target of 1.25 will contribute to minimizing energy losses associated with data center operations.

Brief written by urgent.news from Korea IT Times's own syndicated text. Machine-written — may contain errors; check the original before relying on it.

Read the original at koreaittimes.com →

More in Business

Indonesia Commits to Help Achieve Nigeria’s 3m Barrels Daily Oil Production Target

– NUPRC opens talks with country on investments as Pertamina eyes 2026 licensing round Peter Uzoho The Nigerian Upstream Petroleum Regulatory Commission (NUPRC) has opened discussions with Indonesia…

  • Nigeria aims to produce 3 million barrels of oil daily by 2030.
  • Indonesia's Pertamina interested in helping Nigeria achieve target.
  • Both countries discuss energy security and investment opportunities.

More from Monday 21 September →