Trump’s Caucasus Trade Corridor Delayed Until 2027
Construction on a trade corridor seen as the lynchpin of the Armenian-Azerbaijani peace deal is facing a delay, according to a top Azerbaijani official. The provisional peace agreement was signed in Washington in August 2025. At that time, the Trump Route for International Peace and Prosperity (TRIPP) had been expected to begin construction by the end of 2026. But in comments published by the…
Construction on the trade corridor known as the Trump Route for International Peace and Prosperity (TRIPP) is facing a delay, according to a top Azerbaijani official. This key component of the Armenian-Azerbaijani peace agreement was initially expected to commence in late 2026. However, Azerbaijani Foreign Minister Jeyhun Bayramov confirmed during comments published by Interfax that construction will not begin until 2027.
The proposed route would create a 42-kilometer trade link through Armenian territory, connecting Azerbaijan to its Nakhchivan exclave and integrating into Turkey's transportation system. Signed in early 2026, a framework agreement between the United States and Armenia covers the development of TRIPP, though detailed operational arrangements remain to be finalized.
The United States is to hold a controlling interest in the corridor. Bayramov attempted to present a positive outlook, stating that the US-Armenian negotiation process is progressing well and that Azerbaijan is upgrading the Nakhchivan segment. Discussions surrounding TRIPP and the broader peace process took place in Baku on September 8, involving senior US and Azerbaijani diplomats.
Iran, Armenia's southern neighbor, had reportedly warned Armenia about potential security concerns, raising the possibility that American personnel might be targeted in the corridor.
Written by urgent.news from OilPrice's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.