NHAI Member Stresses Faster Work On Tejaji Nagar-Balwada Section In Indore
Indore (Madhya Pradesh): Vipinesh Sharma, member (project) of the National Highways Authority of India (NHAI), inspected the 33.4 km-long under-construction Tejaji Nagar-Balwada package of the Indore-Khandwa National Highway and emphasised the need to accelerate construction through better coordination and continuous monitoring. Sharma assessed key sections of the project and the tunnel under…
In Indore, Madhya Pradesh, Vipinesh Sharma, a member of the National Highways Authority of India (NHAI), visited the under-construction Tejaji Nagar-Balwada section of the Indore-Khandwa National Highway. The 33.4 km-long project required Sharma's attention as he stressed the importance of accelerating construction by improving coordination and continuous monitoring.
Sharma conducted a thorough assessment of key areas, including the tunnel, reviewing progress and activities at the site. He insisted on following technical procedures and safety standards meticulously. During his visit, Sharma engaged in conversations with relevant officials, discussing the project's status and outlining an action plan.
He emphasized the need for efficient resource utilization, effective task coordination, and regular project reviews to expedite work. Additionally, Sharma inspected Package-1 of the Ujjain-Garoth project, closely examining the RE (Reinforced Earth) wall construction and urging adherence to technical standards and quality norms. He firmly communicated that no compromises should be made on quality during construction, emphasizing the importance of maintaining safety measures, allocating necessary resources, and conducting regular site monitoring.
Written by urgent.news from Free Press Journal's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.