28 Dubai Police sites go solar, cutting 26,000 tonnes of carbon emissions a year
28 Dubai Police sites go solar cutting 26,000 tonnes of carbon emissions a year
Dubai Police has successfully initiated a solar energy project that has converted 28 police sites, resulting in an estimated annual reduction of 26,000 tonnes of carbon emissions. This milestone represents 20% of the total carbon emissions generated by Dubai Police buildings, signalling a significant stride towards a cleaner energy future and more efficient resource utilization.
Led by the General Department of Logistics Support, the project began at COP28 in 2023 and is part of a 25-year strategy to integrate solar energy solutions across Dubai Police buildings and facilities.
The initial phase encompassed 28 locations, such as police stations, general departments, and other facilities. The project's approach is tailored to the unique characteristics of each site, considering factors like age, design, and operational needs to seamlessly integrate sustainable technologies without disrupting law enforcement activities.
Engineer Maryam Rashid Bonfour, Director of the Energy Efficiency Projects Portfolio at the Environment, Health and Safety Department of the General Department of Logistics Support, emphasized that the initiative extends beyond merely installing solar panels. It is an integral part of a larger strategy to enhance the efficiency of police buildings, optimize resource consumption, lower carbon emissions, and advance the transition to eco-friendly green buildings.
According to Bonfour, the first phase has successfully prepared 28 sites to contribute to an annual emissions reduction of 26,000 tonnes, accounting for approximately 20% of the total carbon emissions from Dubai Police buildings. This accomplishment aligns with broader national and Dubai objectives for clean energy, carbon reduction, and the green transformation of structures, as well as the United Nations Sustainable Development Goals.
The solar initiative is designed as a prolonged transformation rather than an isolated endeavor. Bonfour clarified that the project spans 25 years and is executed through meticulously planned phases, taking into account the specific attributes of police buildings, including existing structures and those built according to Dubai Police operational requirements.
The project is poised to commence its second phase during the last quarter of 2026, progressively extending solar energy solutions to more buildings and facilities. This endeavor supports the Dubai Clean Energy Strategy 2050 and Dubai’s broader strategy to diminish carbon emissions, with an aim to double the reduction to 50% by the end of 2030.
Additionally, it reinforces Dubai Police’s dedication to sustainability and prudent resource management. Dubai Police previously achieved the distinction of being the first police organization globally to officially join the United Nations Global Compact, aligning with its ten principles on human rights, fair labor practices, anti-corruption, and environmental stewardship.
The police department also saves Dh367 million through a 75% reduction in bureaucratic inefficiencies and delivers a Dh647.9 million impact for 3.8 million people.
Written by urgent.news from Gulf News's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.