Urgent.News

What's breaking now, across thousands of outlets.

World

AREPO AND CRISIS OF ELECTRICITY

Electricity supply in Arepo and environs is increasingly becoming epileptic, writes AKINLOLU AKINPELUMI For millions of Nigerians, electricity is not something they simply rely on. It is something they keep

Electricity in Arepo and surrounding areas is increasingly unreliable, according to Akinolu Akinpelumi. Residents experience frequent power outages, ranging from hours to days, as the community continues to expand. The main issues involve transformers, feeders, transmission lines, and other components of the electricity network.

While residents have engaged with Ikeja Electric for repairs and explanations, the core issue is whether the existing infrastructure can reliably deliver power to growing numbers of consumers. Arepo has seen rapid development, with new homes, businesses, and demand for electricity, placing increasing pressure on the network. The repeated transformer failures, like Balogun Distribution Transformer 2, highlight the need for a deeper investigation into the transformer's condition, loading, and the overall network.

Extending beyond Arepo, some outages originate from upstream transmission issues, demonstrating that responsibility for maintaining power supply should be shared among generation, transmission, distribution, regulators, and consumers. The Band B classification system for electricity supply must align with the service customers pay for and the network's actual performance.

However, downgrading service tiers should not be a substitute for addressing infrastructure problems. The consequences of unreliable electricity extend beyond mere inconvenience, affecting businesses, families, and essential services like water supply and internet access. In response, Arepo's proactive engagement with Ikeja Electric demonstrates a positive step toward demanding accountability.

However, this engagement must yield concrete information about the failures, repair efforts, and preventive measures. Nigeria should transition from merely repairing damaged infrastructure to conducting comprehensive technical assessments that consider transformer capacity, feeder loading, peak demand, fault history, upstream constraints, and future growth.

This assessment should inform the creation of a robust infrastructure master plan. Ultimately, Arepo's challenges mirror the broader electricity crisis facing Nigeria, where not only is there a need for increased power generation, but also for reliable transmission and distribution infrastructure. The objective should not merely be to restore electricity, but to build a resilient system capable of maintaining power supply.

Written by urgent.news from This Day's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Read the original at thisdaylive.com →

More in World

LESSONS FROM NEPAL’S FLOOD DISASTER

Government should invest heavily in flood prevention The people of Nepal are still counting their losses from the devastating flash flood which ripped through their border with China, inundating…

OIL WEALTH, POOR STUDENTS AND THE NELFUND QUESTION

KALU OKORONKWO argues for a periodic review of the students’ upkeep allowance There is perhaps no more jarring illustration of Nigeria’s confused understanding of educational opportunity and social…

  • Kalu Okoronkwo calls for periodic review of students' upkeep allowance.
  • Tinubu suggests NELFUND beneficiaries could earn income through petty trading.
  • Nigeria's oil wealth contrasts with students' financial burdens and loan repayment expectations.

ABUJA FLOODS: NATURE’S RECKONING

The Abuja Master Plan must not be subordinated to plot-allocation pressures, writes PAT ONUKWULI Abuja was conceived as the triumph of planning over disorder. Yet after recent deluges turned Wuse II,

  • Abuja floods result from obstructed natural paths and climate change.
  • Mpape-Maitama-Wuse drainage corridor drained for development.
  • Flood-resilience policy needed to protect waterways and green spaces.

THE CHALLENGE OF JIHADI DRUG CAPTAGON

There was something unusual about one of the recent drug interceptions at the Murtala Muhammed International Airport in Lagos. It was not just the quantity involved or the fact that

  • 47,200 Captagon tablets seized in Lagos airport
  • Drugs concealed in Ghana soap, highlighting traffickers' tactics
  • Arrestee revealed drugs for northern Nigeria distribution

More from Wednesday 9 September →