Weija Dam spillage to resume September 9 as GWL orders residents to evacuate
Ghana Water Ltd will resume spillage at the Weija Dam from 9 September as water levels near the 46-foot threshold, ordering downstream residents to evacuate.
Ghana Water Limited (GWL) announced it will resume water spillage at the Weija Dam starting Wednesday, September 9, 2026. This action comes as the dam's water level approaches 46 feet, according to the company. The water level has currently reached 45.2 feet, a result of heavy rains upstream and ongoing rainfall in the Densu River's catchment area.
The decision to resume spillage is a precautionary measure to protect the dam's stability. Consequently, all residents living downstream of the Weija Dam are being advised to evacuate the area. Authorities urge residents to stay vigilant, adhere to official evacuation instructions, and refrain from activities that could put them at risk.
Ghana Water Limited has reached out to the National Disaster Management Organisation (NADMO), local assemblies, traditional leaders, assembly members, resident associations, and other relevant stakeholders to prepare for the potential evacuation. Affected communities include Tetegu, Oblogo, Pambros Salt, Lower McCarthy Hill, Lower Weija, Bojo Beach, Ada Kopey, and neighboring areas.
The company is closely monitoring the situation and will provide further updates. Public cooperation and safety are emphasized as the company's top priorities. This statement was issued by the Public Relations and Communications Department of Ghana Water Limited on September 6, 2026.
Written by urgent.news from MyJoyOnline Ghana's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.
This story
This is one outlet's version. Read the fullest account.
- Ghana Water to resume spillage at Weija Dam from Wednesday myjoyonline.com