Dubai RTA steps up night-time road maintenance, rehabilitation
Dubai’s Roads and Transport Authority (RTA) has ramped up its night-time road maintenance and rehabilitation efforts to minimize disruptions for morning commuters. The Authority maintains a high standard of 95% excellent ratings across its network through scheduled assessments and targeted upkeep. Night operations include a range of activities such as asphalt repairs, pavement rehabilitation, bridge and tunnel maintenance, drainage systems upkeep, and installation of street lighting, traffic signals, signage, and safety barriers.
During the first half of 2026 alone, the RTA has rehabilitated 17 kilometers of asphalt across nine major streets and six districts, with a target of 90,000 square meters of pavement maintenance for the year, up from 88,000 square meters in 2025. Prioritizing maintenance is achieved through automated asset-data analysis, smart diagnostic systems, field inspections, customer reports, and traffic volume metrics.
Before work commences, dedicated traffic management plans are put in place to ensure all lanes reopen prior to the morning peak, enhancing safety and preserving overall network efficiency.
Brief written by urgent.news from Gulf News's own syndicated text. Machine-written — may contain errors; check the original before relying on it.