Urgent.News

What's breaking now, across thousands of outlets.

Business

Moa Point failure could have been avoided, Crown investigator says

And he says risks with a critical project were missed - akin to doctors performing heart surgery on a patient without fully assessing complications.

An independent Crown investigation into the catastrophic flooding of Wellington's sewage treatment plant at Moa Point has concluded that the disaster could have been prevented. According to the review, systemic governance failures by Wellington City Council, Wellington Water and the plant's operator Veolia led to the crisis. The investigation found that the plant's ultra-violet disinfection system, which was under renovation, was inadequately assessed for broader risks, much like performing heart surgery without considering the patient's overall health.

The final stage of treatment, which required UV channels to be replaced, significantly reduced the plant's capacity. As a result, more raw sewage was redirected through a bypass pipe, causing it to choke and flood during heavy rain. Six recommendations were made, focusing on accountability, communication and infrastructure management.

Chair of the Crown Review Team, Raveen Jaduram, stated that the most concerning aspect was that the catastrophe could have been avoided.

Written by urgent.news from RNZ Business's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Read the original at rnz.co.nz →

More in Business

Canva Turns to EBANX and Capitec on Subscription Payments

Online graphic design tool Canva has instituted a new way to offer recurring subscription payments. This offering is open to Canva customers in South Africa through Capitec Pay, the account-to-account payment method from the country’s Capitec bank, the companies announced in a news release Wednesday (Sept. 2).

More from Wednesday 2 September →