Mast Project: New Juaben South MCE Calls For Calm
The Municipal Chief Executive (MCE) for New Juaben South, Hon. Ransford Owusu Boakye, has appealed to drivers, traders, and other stakeholders at the Koforidua-Kumasi Lorry Station to remain calm over plans to construct a telecommunications mast at the transport terminal. According to the MCE, the location was not chosen arbitrarily but followed technical assessments conducted […] The post Mast…
The Municipal Chief Executive (MCE) of New Juaben South, Hon. Ransford Owusu Boakye, has called for calm over plans to build a telecommunications mast at the Koforidua-Kumasi Lorry Station. The MCE explained that the location was chosen based on technical assessments conducted by engineers from African Towers Company. The station was selected as it was the only location within the municipality that could receive a strong signal required for the project.
The proposed mast aims to enhance mobile network coverage, internet connectivity, and overall telecommunications services in Koforidua and surrounding communities. Despite the technical reasoning behind the location, some drivers and traders at the lorry station have raised concerns about the suitability of installing such infrastructure at a busy transport and commercial center.
The MCE addressed these concerns at a media briefing, stating that the decision was primarily based on technical requirements and that engineers found the Kumasi station to be the only suitable location among several assessed. He urged concerned stakeholders to engage the Municipal Assembly and the project developers to address their concerns.
The project has received approval from the Ministry of Communication and the Environmental Protection Agency, with no identified environmental or health risks. The MCE emphasized the importance of reliable connectivity for businesses, financial institutions, schools, and residents, stating that improved network infrastructure would benefit the entire municipality.
He called for dialogue and cooperation over confrontation, promising continued engagement between stakeholders, the Assembly, and project developers.
Written by urgent.news from The Chronicle Ghana's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.