Chevron Panama Solar Project Breaks Ground at Colón Fuel Terminal
Chevron laid the first stone for a 4.03 MWp solar plant at its Bahía Las Minas fuel terminal in Colón on 20 August 2026. Built with Celsia, it will generate about 5.15 GWh a year and cover all the terminal's power needs. The post Chevron Panama Solar Project Breaks Ground at Colón Fuel Terminal appeared first on The Rio Times .
Chevron's 4.03 MWp solar project has commenced at the fuel terminal in Bahía Las Minas, Colón, Panama. This 30-year project is expected to generate 5.15 GWh of renewable electricity annually, covering the entire power consumption of the terminal's operations. The plant, built by Chevron in partnership with Colombian energy company Celsia, will cover four hectares of land on the terminal.
The installation consists of 6,714 solar panels spread over the four hectares and is designed for a 30-year service life. Once operational, the solar power plant will eliminate approximately 1,809.3 tonnes of CO2 emissions per year, contributing to Chevron's sustainability efforts.
Written by urgent.news from The Rio Times's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.