Rainbow Valley Bridge work wrapping up on Whitemud Drive
After two and a half years of near-daily gridlock on Whitemud Drive in southwest Edmonton due to Rainbow Valley Bridge construction, the light at the end of the tunnel is near.
We haven't written up this one. Global News has the full story — the link below goes straight to it.