Urgent.News

One page, thousands of outlets. See who else covered it.

Editions

Tech

General : Developer Withdraws Kota Damansara Data Centre Application After Public Raises Concerns – Ramanan

PETALING JAYA, Aug 20 (Bernama) -- The proposed data centre project in Kota Damansara is off the table for now, after the developer withdrew its planning permission application to the Petaling Jaya City Council.

We haven't written up this one. Bernama has the full story — the link below goes straight to it.

Read the original at bernama.com →

More in Tech

A green pipeline that deployed nothing

The worst CI outcome is not a failing build. It is a passing build that did nothing and looked correct. Here is one way to get there, and it takes a single missing line of YAML.

  • Pipeline deploys no changes despite green build
  • Azure DevOps shallow clone results in no git diff
  • Fix includes correct pipeline setup and GitError check

[Insight] Beyond HBM: SK hynix Maps the Next AI Battleground in Optical Interconnects

SK hynix has outlined a roadmap for co-packaged optics, or CPO, that could extend the company’s role in AI infrastructure beyond HBM and into the high-speed optical links connecting processors, memory…

  • SK hynix plans to integrate optical interconnects into AI infrastructure beyond HBM.
  • Research in Nature Electronics outlines a roadmap for high-speed connectivity.
  • Goal is 100 Tb/s bandwidth per node with low power consumption and latency.

More from Thursday 20 August →