Hycroft reports high-grade silver drill results from Nevada mine
Hycroft Mining Holding Corporation has reported high-grade silver drill results from its 2025-2026 exploration program at the Hycroft Mine in Nevada. At the Brimstone site, drilling intersected 82.7 meters at 87.52 grams per tonne silver and 0.77 grams per tonne gold, with an additional 19.4 meters at 108.19 grams per tonne silver and 2.10 grams per tonne gold.
At the Vortex site, drilling extended the silver system approximately 150 meters west, with an intersection of 12.5 meters at 375.41 grams per tonne silver, including 4.2 meters of 748.02 grams per tonne silver. The company has completed approximately 15,585 meters of core drilling out of a planned 26,000-meter program, with plans to drill an additional 7,200 meters at Brimstone and 3,000 meters at Vortex.
Hycroft's CEO, Diane Garrett, stated that the results confirm the size, continuity, and growth potential of the high-grade silver systems at Brimstone and Vortex, and the company is evaluating options for development, including the potential for an underground silver mine.
Brief written by urgent.news from Investing.com's own syndicated text. Machine-written — may contain errors; check the original before relying on it.