Urgent.News

What's breaking now, across thousands of outlets.

Business

Clear encroachments from Pipeline Road in Kochi, says KWA

The drive against encroachers is being taken up ahead of laying pipelines to the city from a 190-mld water treatment plant that has been planned

Clear encroachments from Pipeline Road in Kochi, says KWA

The Kerala Water Authority (KWA) has instructed the removal of encroachments within a week from Pipeline Road, citing hazards to pedestrian and vehicle traffic. This directive follows an inspection conducted by the agency. Notice has been sent to individuals, some of whom have placed garden pots on the road, prompting the commencement of the eviction process.

Non-compliance within the set timeframe will result in further legal action from both police and courts. Survey stones are set to be installed in the corridor soon, aligned with the district administration, as per Rathish Kumar S., superintending engineer at KWA. The eviction campaign precedes the pipeline installation for the city's water supply from a 190-million-liter-per-day treatment facility.

Written by urgent.news from The Hindu's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Read the original at thehindu.com →

More in Business

More from Friday 14 August →