Urgent.News

What's breaking now, across thousands of outlets.

Business

Massive, slow-moving load may cause central Alberta traffic delays

The super-heavy de-ethanizer, which is used in natural gas processing, will make its way through central Alberta for the rest of the week at a maximum speed of 30 km/h.

Massive, slow-moving load may cause central Alberta traffic delays

A massive, slow-moving load is set to cause potential traffic delays in central Alberta for two days starting at 11 p.m. on Wednesday, August 12, according to the province. The de-ethanizer load, utilized in natural gas processing, is expected to travel at a maximum speed of 30 km/h, moving between Edmonton and Fort Saskatchewan.

Accompanied by guide vehicles, the load will be transported on trailers carrying 448 wheels, as stated by the provincial government in a release. Measuring 1.65 million pounds, the load will span the entire width of the highway, including the shoulder, which is 7.7 meters wide. Standing at 10.5 meters high and 96.6 meters long, the province has shared the load’s route through central Alberta.

For real-time road information and traffic updates, motorists are advised to dial 511. Global News can be added as a Preferred Source on Google to access more of their stories in search results.

Written by urgent.news from Global News's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

This story

This is one outlet's version. Read the fullest account.

Read the original at globalnews.ca →

More in Business

Sugar producers brace for El Niño

Khon Kaen Sugar Industry Plc (KSL), Thailand's third-largest sugar exporter, has voiced concern that an impending "super El Niño" could severely disrupt sugar cane plantations during the…

More from Wednesday 12 August →