Urgent.News

the world's headlines, one feed

Tech

Your Robot Coworker Is Still a Pilot

In February, BMW published the results of a pilot at its plant in Spartanburg, South Carolina. A humanoid robot made by Figure had been lifting sheet metal parts into a welding cell, ten-hour shifts, Monday to Friday. The release is precise about what happened. The robot moved more than 90,000 components. It covered approximately 1.2 million steps. It ran for around 1,250 operating hours. Within…

Abstract editorial illustration

In February, BMW announced the results of a pilot at its Spartanburg, South Carolina plant. A humanoid robot made by Figure lifted sheet metal parts in a welding cell for ten-hour shifts, Monday through Friday. The robot moved over 90,000 components, covering approximately 1.2 million steps and operating for around 1,250 hours. Within ten months, it supported the production of more than 30,000 BMW X3s.

The release refers to the robot as "the robot Figure 02" in the singular, without specifying how many were on the floor. Secondary sources cite two robots, but BMW does not disclose this number. The robot's impact is on the fourth rung of a ladder, representing the robot's productive work with limited human intervention. This rung is uncounted, and examples show that a robot in a warehouse, lab, or hotel lobby can be built, shipped, and installed but may not be working.

Agility Robotics, a Chinese manufacturer, produced and shipped over 5,500 humanoid robots in 2025, but the counts differ by 1,000 units. Agility announced a $2.5 billion merger with Churchill Capital Corp XI, where the robot count is listed in a footnote as 1,000 Digit v5 robots with a three-year term RaaS contract. The footnote states the figure relates to customer orders as of May 2026, but it does not specify the number of robots built, shipped, or installed.

The counting of humanoid robots productively doing paid work with limited routine human intervention remains an unmeasured aspect despite significant capital and attention.

Written by urgent.news from Dev.to's reporting — not their text. Machine-written; read the original for the full account.

Read the original at dev.to →

More in Tech

Where Your Metrics Fold

The dashboard read 87 percent complete, and it was right: 87 percent of the scheduled tasks for the launch were genuinely done, ticked off, verified. The board did its job.

  • Single metric fails to capture incomplete project status
  • Four types of folds: composition, trajectory, structure, mechanism
  • Identifying folds requires asking four critical questions

Hardware Backdoors in x86 CPUs: The 2026 Hacker News Wake-Up Call

Hardware Backdoors in x86 CPUs: The 2026 Hacker News Wake-Up Call In late January 2026, the front page of Hacker News was dominated by a single, chilling headline: "Hardware backdoor found in X Series…

  • German security group discovers hardware backdoor PADMIN in x86 CPUs (2026)
  • Backdoor allows attackers to bypass security controls and access physical memory
  • PADMIN operates at core level, nearly impossible to disable via firmware settings