Urgent.News

What's breaking now, across thousands of outlets.

AI

AI boom lifts mining while competing for power

Artificial intelligence is becoming both customer and rival for mining.

Alberta's data centre boom is simultaneously boosting mining development and competing for power resources. E3 Lithium's Clearwater lithium project is facing opposition from nearby data centres, which developers claim is damaging the reputation built for the lithium project. Meanwhile, Meta Platforms announced a $13 billion AI centre in Sturgeon County, prompting E3 to reevaluate its power consumption plans.

AI-driven demand for metals like copper, lithium, and aluminum is expected to nearly double global data centre electricity use by 2030, straining resources required for mining operations. Alberta and British Columbia are updating power rules to accommodate fast-growing technology companies, potentially hindering slower mine projects.

Metals are becoming increasingly essential for data centres, with copper demand projected to rise by half by 2040. Both E3 and Vale Base Metals see AI as a significant driver for copper demand, with Vale highlighting the need for electric pumps and dedicated power supply for their Clearwater project. Competing for power resources will intensify as more industries transition to electricity, potentially impacting the timing and cost of mining projects.

Written by urgent.news from Mining.com's reporting — not their text. Machine-written — may contain errors; check the original before relying on it.

Read the original at mining.com →

More in AI

Node Date's epoch millisecond pit + using MCP to stuff the conversion into the AI stream

Node Date 的 epoch 毫秒坑 + 用 MCP 把转换塞进 AI 流 作者是 Node.js / JS 时间 方向的开发者。这篇不是广告,是踩坑记录 + 顺手做的工具。 背景 做 Node.js / JS 时间 时,时间戳转换是最常被低估的雷区。16 个时间戳工具(Unix 转换/时区/ISO8601/Cron/Duration…) 已覆盖日常;但每个语言/框架的坑都不一样,所以又补了…

More from Monday 3 August →