Séguéla revamp sets up decade of 200,000‑oz production
Processing capacity will rise 30%, from 1.75M to 2.3M tonnes, boosting average gold recovery to 94.5%.
We haven't written up this one. Mining.com has the full story — the link below goes straight to it.