{
  "id": 9605811,
  "title": "Goregaon-Mulund Link Road Project: First TBM ‘Tulsi’ Tunnels 64 Metres, Second Machine ‘Vihar’ Nears Launch",
  "url": "https://urgent.news/2026/09/24/goregaon-mulund-link-road-project-first-tbm-tulsi-tunnels-64-metres",
  "topic": "world",
  "section": "World",
  "published": "2026-09-24T17:50:00.000Z",
  "source": {
    "name": "Free Press Journal",
    "slug": "free-press-journal",
    "url": "https://www.freepressjournal.in/mumbai/goregaon-mulund-link-road-project-first-tbm-tulsi-tunnels-64-metres-second-machine-vihar-nears-launch"
  },
  "original_language": "en",
  "account": null,
  "summary": "Mumbai, September 24, 2026: The BMC's ambitious Goregaon-Mulund Link Road (GMLR) project has entered a crucial tunnelling phase, with the first Tunnel Boring Machine (TBM), ‘Tulsi’, already 64 metres into the excavation beneath Sanjay Gandhi National Park (SNGP). The 5.3-km twin-tunnel project, connecting Goregaon (East) with Mulund (West), is set for another major push as the second TBM,…",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}